Hilton Hotel Qatar

Completed
Client New Doha Hotels Company
Location Qatar
Scope Of Work Electrical Mechanical
Schedule Completed

Project Detail

Electrical: External, Internal & Facade Lighting, Landscape, Small Power, Lighting Control System, Structural Cabling, Barrier,Conference, Auditorium, CCTV, Fire Alarm, Music, Public Address, Building Management System, Power Plant: UPS,Transformers, Generator, MV Panel & Sub-Main Distribution Boards, Motor Control Center, Earthing & Lightning Protection.

Mechanical: HVAC: District cooling of 2500 tones capacity with Heat Exchanger, Ducting, Chilled Water Pipe, Insulation,AHU’s, VAV’s , Air Outlets, Chilled Water Pumps,Ventilation Smoke & Pressurization Fans.Steam Boiler: Two Main Steam Boiler of 2500kg/hour capacity@10 bar with all Piping & Steam Accessories,Blow Down Vessel, Deareator Tank Plumbing : A Full Filtration System consisting of Sand Filter,
Reverse Osmosis Unit, Softener, UV Sterilizer Complete with Full Pumping Station with capacity up to 17 bar head, Drainage & Rain Water System, LPG Hot Water Boiler with Central  Fire Protection  A Main Fire Station of 1000gpm@19 Bar Head Horizontal Type with a Dry & Wet Piping System, Sprinkler, Zone Valve Hose Real, Landing Valves & FM200 Clean Agent System.